LATEST UPDATES
Loading latest news from Mehrabpur...

Sukkur Greenfield Airport Project 2026: Official Launch & Key Details | Northern Sindh Aviation Hub

Sukkur Greenfield Airport Project Formally Launched: A Transformed Vision for Northern Sindh (Tando Masti).

SUKKUR: A new era of infrastructure development has officially commenced for Northern Sindh. The Pakistan Airports Authority (PAA) has formally launched the feasibility study, master planning, and detailed design services for the long-anticipated Greenfield Airport Sukkur.

The high-level “Kick-off Meeting” held in Sukkur set the project in motion, bringing together senior government officials, aviation experts, and business leaders to define the roadmap for the airport’s development.

Project Partners: World-Class Aviation Expertise

PAA has contracted M2P German and Leit-Werk, two of the world’s most distinguished aviation consultancy firms, in joint venture with local partners Indus Associated Consultants and Cosmic Engineering Consultant. This elite team will lead the project’s feasibility, master planning, and detailed engineering design phases.

The partnership ensures the new airport is designed to meet international standards for both efficiency and passenger experience.

Strategic Location: Tando Masti, Khairpur District

During the meeting, PAA top officials confirmed that the proposed new airport will be located near Tando Masti (District Khairpur). This strategic site ensures the airport is easily accessible via the National Highway and will serve a wider region, including Khairpur, Mehrabpur, and Naushahro Feroze, effectively connecting them to major travel routes.

Economic Impact: Economy and Job Generation

DG PAA, Air Vice Marshal Zeeshan Saeed, and Deputy DG Engr Sumair Saeed emphasized that the new airport will be a transformative initiative for the entire region:

  • Economic Catalyst: It is expected to significantly boost regional trade, tourism, and industrial growth.
  • Employment Generation: The construction and operational phases will generate thousands of jobs for the local community.
  • Aviation Hub: It will position Sukkur as a major aviation hub in Upper Sindh, enhancing both regional and international connectivity.

Meeting Attendees

The meeting was attended by Divisional Commissioner Sukkur Abid Saleem, the Deputy Commissioner of Sukkur, along with representatives from the Rangers, Police, Customs, Academia, and the Sukkur Chamber of Commerce, highlighting the widespread support for this landmark project.


Mehrabpur Sindh Editor’s Note:

“This project is highly significant for our local community. The proposed location near Tando Masti ensures that Mehrabpur will have direct, efficient access to an international-standard airport, drastically reducing travel time and opening new trade possibilities for local businesses.”


Quick Facts: Sukkur Greenfield Airport Project

Project Phase Details
Project Type Greenfield (Built from Scratch)
Lead Consultants M2P German & Leit-Werk (JV)
Location Near Tando Masti, Khairpur District
Current Status Feasibility & Master Planning (Launched)
Key Benefits Job Creation, Trade Boost, Tourism Growth

Stay connected to MehrabpurSindh.com for ongoing updates on this landmark development project!is transformative project!

3 thoughts on “Sukkur Greenfield Airport Project 2026: Official Launch & Key Details | Northern Sindh Aviation Hub”

  1. ali ahmedrajper

    This project will be most beneficial for upper Sindh, Multan. and Balochistan. This will be Bomby of Pakistan

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top