For years, anyone traveling between Karachi, Hyderabad, and Upper Sindh has known the daily grind of the N-5 National Highway—dodging heavy freight trucks, navigating congested town centers, and spending six exhausting hours on a journey that should take half as long.
Now, Pakistan’s long-awaited “missing link” in the north-south motorway network has cleared a major federal hurdle.
The Public-Private Partnership Authority (P3A) board officially approved commercial plans for the first two critical sections of the 306-kilometer Hyderabad-Sukkur Motorway (M-6). Chaired by Prime Minister’s Adviser on Privatisation Muhammad Ali during its 46th board meeting, the decision unlocks a 121-kilometer stretch for private investment. Once the entire corridor is built, the six-lane, access-controlled highway is projected to slash travel time between Hyderabad and Sukkur from six hours down to just three hours.
For residents of Mehrabpur and District Naushahro Feroze—who sit directly along the central alignment of the M-6—this approval marks a critical step toward faster trade, safer family travel, and direct motorway access to both Karachi and Punjab.

What Was Just Approved by the Federal Government?
Rather than building the entire 306-kilometer corridor under a single contract, the National Highway Authority (NHA) has split the M-6 into five distinct sections with an estimated total project cost of Rs. 359 billion.
Under the latest P3A approval:
- Sections I & II Cleared for Private Investment: The board approved separate 25-year Build-Operate-Transfer (BOT) concession agreements for the first 121 kilometers stretching from Hyderabad to Nawabshah. Private investors will finance, construct, and operate these stretches—recovering their capital through toll collection—before handing the highway back to the NHA.
- Government Financial Support: To make the project financially viable for investors and keep toll rates affordable for everyday commuters, the federal government will provide Viability Gap Funding (VGF) for Section I.
- International Advisory: The Asian Development Bank (ADB) is serving as the official transaction adviser to oversee transparent bidding from local and international construction firms.
Complete Section-by-Section Breakdown of the M-6 Motorway
Unlike the first two sections, the upper three sections—which pass directly through District Naushahro Feroze (near Mehrabpur, Halani, and Kandiaro)—are being financed through sovereign development loans from the Islamic Development Bank (IsDB) and the OPEC Fund.
| Section | Route Alignment | Length | Estimated Cost | Financing Model & Current Status |
|---|---|---|---|---|
| Section-I | Hyderabad to Tando Adam | 57 km | Rs. 81 Billion | PPP / BOT Mode (P3A Approved; VGF backed) |
| Section-II | Tando Adam to Nawabshah | 63 km | Rs. 70 Billion | PPP / BOT Mode (P3A Approved; Bids opening soon) |
| Section-III | Nawabshah to Naushahro Feroz | 65 km | Rs. 69 Billion | Islamic Development Bank / OPEC Fund (Procurement stage) |
| Section-IV | Naushahro Feroz to Ranipur | 61 km | Rs. 68 Billion | Islamic Development Bank / OPEC Fund (Procurement stage) |
| Section-V | Ranipur to Sukkur | 60 km | Rs. 71 Billion | Islamic Development Bank / OPEC Fund (Procurement stage) |
Why the M-6 Matters for Mehrabpur & Interior Sindh
Once completed, the M-6 will connect the existing Karachi-Hyderabad Motorway (M-9) directly to the Sukkur-Multan Motorway (M-5), finally establishing an uninterrupted high-speed corridor from the Arabian Sea ports all the way to Peshawar.
For communities across District Naushahro Feroze and Mehrabpur, the impact goes far beyond saving fuel:
- Safer Intercity Commutes: Long-distance passenger buses and heavy container trucks currently funnel straight through congested N-5 towns like Moro, Naushahro Feroze, and Bhiria Road. Shifting commercial freight onto the M-6 will drastically reduce fatal highway accidents and local traffic bottlenecks.
- Boost for Local Agriculture & Trade: Farmers and traders in Mehrabpur and surrounding towns will gain faster, lower-cost logistics access to wholesale markets in Karachi, Hyderabad, and Sukkur.
- Faster Access to Major Hubs: Reaching Hyderabad or Sukkur by road will take roughly 90 minutes from central Naushahro Feroze interchanges once the highway opens. (Prefer rail travel in the meantime? Check our updated Mehrabpur Junction Train Timings & Ticket Guide.)
Reality Check: When Will Construction Actually Start?
While the P3A approval is a genuine milestone, commuters should keep realistic expectations: this is a regulatory and financial clearance, not an immediate road opening.
According to recent NHA briefings to the National Assembly’s Standing Committee on Economic Affairs, competitive bids for Sections I and II are scheduled to close by December 30, 2026, with final concession awards targeted for February 2027. Meanwhile, procurement and land-related groundwork for Sections III, IV, and V—covering the Naushahro Feroze corridor—are progressing separately under international lender guidelines.
For now, drivers and transporters must continue using the existing N-5 National Highway and Mehran Highway until physical groundwork and interchange construction visibly commence on the ground.
Stay tuned to MehrabpurSindh.com for verified local updates on M-6 interchange locations, land acquisition notices in District Naushahro Feroze, and Sindh Government Youth & Development Schemes.

